Page 2 of 4 FirstFirst 1234 LastLast
Results 16 to 30 of 58

Thread: ISU update

  1. #16
    Pro
    Points: 45,752, Level: 66
    Level completed: 15%, Points required for next Level: 1,198
    Overall activity: 7.0%
    Achievements:
    Veteran25000 Experience PointsCreated Album pictures

    Join Date
    Apr 2006
    Location
    Mount Vernon, WA
    Posts
    2,056
    Points
    45,752
    Level
    66

    Re: ISU update

    scyclonekid - do you work for Central Stores? I worked there from '99 - '04. That managed to be both a cool and crappy job all at the same time. The work sucked, but we got access to some cool places. Plus we got to drive on the sidewalks.

  2. #17
    Pro
    Points: 25,049, Level: 48
    Level completed: 50%, Points required for next Level: 501
    Overall activity: 0%
    Achievements:
    Veteran25000 Experience Points
    ornryactor's Avatar
    Join Date
    Jun 2006
    Location
    Ames
    Posts
    2,633
    Points
    25,049
    Level
    48

    Re: ISU update

    Oh, another thing: they're completely replacing the exterior staircase on Curtiss Hall. The old steps were the originals, and were so badly grooved that going down them had actually become dangerous. People were slipping and falling and such. Since the university doesn't like people with broken skulls suing them, they hired a mastor stoneworker (or mason or whatever they're called) to oversee replacement. The new steps will be absolutely identical to the originals, so no worries there. I never would have guess how huge a job it is, though- it's taking all summer, and they're also replacing the entire supporting structure beneath the steps.

    What else? The ground floor and south exterior stairs of Carver got a big renovation last fall. The Hixon-Lied Academic Success Center opened up last year, as well, right across from MWL (where the Wallace Rd. Office Building used to be). Once the Alumni Association finishes moving out, Fisher-Nickell House will be demolished this month. Though nothing has been announced, it's a sure thing that Andrews-Richards House is going to go sooner or later. (Currently used by Human Development/Family Studies.)
    True and Valiant

    I also remember a game with Kansas when Cy (wore a huge suit then) went out to center field, squatted, and "pooped" a couple of chickens that had been dyed blue then chased them around.
    Quote Originally Posted by DJK15

    God I hope so, even if it's not the right thing to do, KF needs to do it.
    Victory before honor.

  3. #18
    Addict
    Points: 154,762, Level: 100
    Level completed: 0%, Points required for next Level: 0
    Overall activity: 3.0%
    Achievements:
    SocialVeteranCreated Album pictures50000 Experience Points
    jaretac's Avatar
    Join Date
    Nov 2006
    Location
    Frigidaire
    Posts
    7,506
    Points
    154,762
    Level
    100

    Re: ISU update

    Quote Originally Posted by ornryactor View Post
    The ground floor and south exterior stairs of Carver got a big renovation last fall.
    That think that was 2+ years ago. I know it was before I started working for the university in '06.

    Quote Originally Posted by ornryactor View Post
    Though nothing has been announced, it's a sure thing that Andrews-Richards House is going to go sooner or later. (Currently used by Human Development/Family Studies.)
    That would be awesome if it happens, but I would not expect to see that happen for at least 2+ years. There is no other place for them to move to.

    One of the biggest projects last year was the Curtiss Auditorium renovation. I had some classes in there my freshmen year, why couldn't they have remodeled it earlier?

  4. #19
    All-Star Achievements:
    Veteran10000 Experience Points
    bmuff's Avatar
    Join Date
    Apr 2006
    Posts
    1,583

    Re: ISU update

    I'll add a few more updates:

    The new Alumni Center will be home to ISU AA tailgates for every home FB game. They may even have live music. Also, they will now be renting out the facility for weddings, etc. There's supposed to be a large ballroom and it even has Cy's Pub and Parlor inside. It will also be a meeting place for alumni to park, meet and shuttle to campus. Should be a nice gameday and year round addition.

    The Memorial Union addition/renovation is pretty much complete. For those of you who don't know, they've remodeled multiple rooms including the Great Hall and moved the welcome desk. Most people would not recognize the University Book Store now. It occupies the top floor of the new addition and has tons more room. There is a new convenience store right across from the entrance now. The bottom floor is going to house an ISU welcome center that is just now under construction.

    Morrill Hall has been completely renovated...finished a year or so ago. Very nice inside.

    The Hub IMO has nearly doubled in size.

    The first part of the Biorenewables Complex (the Biorenewables Lab?) should start construction this fall. The other two parts down the line are the Ag/Biosystems Engineering Building (Elings Hall) and a parking structure.

    There's a feasibility study underway to look at renovating Curtis.
    XXXX Master Shake is under gag order XXXX

  5. #20
    Addict
    Points: 154,762, Level: 100
    Level completed: 0%, Points required for next Level: 0
    Overall activity: 3.0%
    Achievements:
    SocialVeteranCreated Album pictures50000 Experience Points
    jaretac's Avatar
    Join Date
    Nov 2006
    Location
    Frigidaire
    Posts
    7,506
    Points
    154,762
    Level
    100

    Re: ISU update

    Quote Originally Posted by bmuff View Post
    I'll add a few more updates:
    The other two parts down the line are the Ag/Biosystems Engineering Building (Elings Hall) and a parking structure.
    The parking ramp still hasn't received funding, nor has it been planned. Building the west ramp is also contingent on future development on west campus; however, with the Design Pavilion, the bio renewable building, and the new recreation building (which will eat up resident parking lots), it's only a matter of time before it gets built.

  6. #21
    All-Star Achievements:
    Veteran10000 Experience Points
    bmuff's Avatar
    Join Date
    Apr 2006
    Posts
    1,583

    Re: ISU update

    Quote Originally Posted by jaretac View Post
    The parking ramp still hasn't received funding, nor has it been planned. Building the west ramp is also contingent on future development on west campus; however, with the Design Pavilion, the bio renewable building, and the new recreation building (which will eat up resident parking lots), it's only a matter of time before it gets built.
    It has been planned. The facilities spreadsheet has the design phase 100% done. I've seen renderings of all three buildings (including the ramp) together. You're right though, it hasn't received funding. IMO this wouldn't be started until after Elings is complete and that isn't supposed to be done until 2013. It is way down the line and it is possible that it MAY never be built. I would assume though that this ramp would be more like the one across from Food Science and not like the ramp by the MU.
    XXXX Master Shake is under gag order XXXX

  7. #22
    Pro
    Points: 25,049, Level: 48
    Level completed: 50%, Points required for next Level: 501
    Overall activity: 0%
    Achievements:
    Veteran25000 Experience Points
    ornryactor's Avatar
    Join Date
    Jun 2006
    Location
    Ames
    Posts
    2,633
    Points
    25,049
    Level
    48

    Re: ISU update

    Quote Originally Posted by bmuff View Post
    I would assume though that this ramp would be more like the one across from Food Science and not like the ramp by the MU.
    That'd be too bad. ISU doesn't need another parking "deck" over there; it needs a honest-to-goodness parking ramp. It doesn't have to be 8 levels tall, like the MU, but it should certainly be bigger than the two smallish levels of the East Campus deck.

    Do you know where we can see the renderings of the 3-building complex? I'm extremely interested in seeing that.
    True and Valiant

    I also remember a game with Kansas when Cy (wore a huge suit then) went out to center field, squatted, and "pooped" a couple of chickens that had been dyed blue then chased them around.
    Quote Originally Posted by DJK15

    God I hope so, even if it's not the right thing to do, KF needs to do it.
    Victory before honor.

  8. #23
    Addict
    Points: 154,762, Level: 100
    Level completed: 0%, Points required for next Level: 0
    Overall activity: 3.0%
    Achievements:
    SocialVeteranCreated Album pictures50000 Experience Points
    jaretac's Avatar
    Join Date
    Nov 2006
    Location
    Frigidaire
    Posts
    7,506
    Points
    154,762
    Level
    100

    Re: ISU update

    Quote Originally Posted by bmuff View Post
    It has been planned. The facilities spreadsheet has the design phase 100% done. I've seen renderings of all three buildings (including the ramp) together. You're right though, it hasn't received funding. IMO this wouldn't be started until after Elings is complete and that isn't supposed to be done until 2013. It is way down the line and it is possible that it MAY never be built. I would assume though that this ramp would be more like the one across from Food Science and not like the ramp by the MU.
    That is what I would guess too. All I know is that Parking is working this year on the rest of the planning and securing funding. I got that from an extremely reliable source. I'm guessing what you saw was initial plans that haven't been finalized.

  9. #24
    All-Star Achievements:
    Veteran10000 Experience Points
    bmuff's Avatar
    Join Date
    Apr 2006
    Posts
    1,583

    Re: ISU update

    Quote Originally Posted by ornryactor View Post
    That'd be too bad. ISU doesn't need another parking "deck" over there; it needs a honest-to-goodness parking ramp. It doesn't have to be 8 levels tall, like the MU, but it should certainly be bigger than the two smallish levels of the East Campus deck.

    Do you know where we can see the renderings of the 3-building complex? I'm extremely interested in seeing that.
    I guess from this picture, it looks a lot closer to the MU ramp than the east parking ramp.

    Inside Iowa State
    XXXX Master Shake is under gag order XXXX

  10. #25
    Addict
    Points: 154,762, Level: 100
    Level completed: 0%, Points required for next Level: 0
    Overall activity: 3.0%
    Achievements:
    SocialVeteranCreated Album pictures50000 Experience Points
    jaretac's Avatar
    Join Date
    Nov 2006
    Location
    Frigidaire
    Posts
    7,506
    Points
    154,762
    Level
    100

    Re: ISU update

    Thanks bmuff. It says that it is a 4 level deck and will cost 22 million.

  11. #26
    Walk On
    Points: 7,312, Level: 25
    Level completed: 53%, Points required for next Level: 238
    Overall activity: 0%
    Achievements:
    Veteran5000 Experience Points

    Join Date
    Apr 2006
    Location
    sheldon
    Posts
    135
    Points
    7,312
    Level
    25

    Re: ISU update

    [quote=jaretac;538316]I don't think the Athletic dept even knows how the concerts are going to help/hurt. SMG has not be forthcoming with information to help the Athletic dept get settled.......

    Well, it would have been a bit naive to have expected them
    to be overjoyed at losing the business, but then there's always
    the saying about "not burning bridges".

    Bottom line is, if there wasn't any money to be made they would
    have been more than happy to have walked away from "a whole
    lot of work for no pay"

    "THANKS" for the original post. It's nice to hear how things are being
    kept up and improved on campus. Is there any pics on how
    some of these "on campus" projects are going? It would be
    cool to watch some of them like you could with the interactive
    Cams they installed on the towers a few years ago.

    m.
    Last edited by moo-u; 07-13-2008 at 08:22 AM.

  12. #27
    Addict
    Points: 154,762, Level: 100
    Level completed: 0%, Points required for next Level: 0
    Overall activity: 3.0%
    Achievements:
    SocialVeteranCreated Album pictures50000 Experience Points
    jaretac's Avatar
    Join Date
    Nov 2006
    Location
    Frigidaire
    Posts
    7,506
    Points
    154,762
    Level
    100

    Re: ISU update

    Check out FP&M's web site at: ISU Facilities Planning and Management. They have live web cams for some of the projects. My only other suggestion is to download Google earth and look at the pictures that myself and other people have uploaded. Or actually, I guess you can go to this website to see those same pictures: Panoramio - Photos of the World.

  13. #28
    Addict
    Points: 63,616, Level: 78
    Level completed: 23%, Points required for next Level: 1,234
    Overall activity: 2.0%
    Achievements:
    Recommendation Second ClassVeteran50000 Experience Points
    Rogue52's Avatar
    Join Date
    Oct 2006
    Location
    Cedar Rapids, IA
    Posts
    5,456
    Points
    63,616
    Level
    78

    Re: ISU update

    The Caribou Coffee is going to be fully owned and operated by ISU Dining? I wish some other companies would allow this since ISU Dining ran all the MU food court tenants out.
    Last edited by Rogue52; 07-14-2008 at 12:05 AM.
    The campaign starts now. November 6, 2012.

  14. #29
    Pro
    Points: 25,049, Level: 48
    Level completed: 50%, Points required for next Level: 501
    Overall activity: 0%
    Achievements:
    Veteran25000 Experience Points
    ornryactor's Avatar
    Join Date
    Jun 2006
    Location
    Ames
    Posts
    2,633
    Points
    25,049
    Level
    48

    Re: ISU update

    Quote Originally Posted by Rogue52 View Post
    The Caribou Coffee is going to be fully owned and operated by ISU Dining? I wish some other companies would allow this since ISU Dining ran all the MU food court tenants out.
    Yeah, that's too bad. Though, to be fair: (1) that happened before we had our current Dining director, who probably would not have allowed that to happen, and (2) McDonald's ran itself out of business. They decided to stop accepting Dining Dollars, then they decided to stop accepting CyCash, then they decided that their food had to be paid for in transactions separate from anything else in the food court. People just didn't want to put up with the hassle, so we/they stopped buying McDonald's food, and they went out of business due to lack of revenue.

    But yeah, I wish we had franchised places instead of what we DO have there. Subway's great, but still.
    True and Valiant

    I also remember a game with Kansas when Cy (wore a huge suit then) went out to center field, squatted, and "pooped" a couple of chickens that had been dyed blue then chased them around.
    Quote Originally Posted by DJK15

    God I hope so, even if it's not the right thing to do, KF needs to do it.
    Victory before honor.

  15. #30
    Hall-Of-Famer
    Points: 63,850, Level: 78
    Level completed: 38%, Points required for next Level: 1,000
    Overall activity: 1.0%
    Achievements:
    SocialVeteran50000 Experience Points
    d4nim4l's Avatar
    Join Date
    Apr 2008
    Location
    West Des Moines, IA
    Posts
    4,733
    Points
    63,850
    Level
    78

    Re: ISU update

    Quote Originally Posted by jaretac View Post
    ISU has installed a new warning system through out campus. There are five: one at Beyer, Forker, UV, VetMed, and Jack Trice. Should come in handy next time our mascot shows up at a game.
    I don't know why, but I found this very funny.

    Edit: Before anyone says anything...I'm well aware of the 2005 Colorado game. I just found it funny to have a warning system for a mascot.

Page 2 of 4 FirstFirst 1234 LastLast

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
  • Football
  • Iowa State vs. Northern Iowa
  • August 31, 2013
  • 07:00 PM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19