Between Colo and State Center the four lane is open, but the east bound lane is only a single lane and still 55mph. It looks like they just need to paint the lines, but I imagine it needs to warm up before they do that.
They have 200 yards or so left to pour concrete to connect the west bound lanes at the hwy 330 intersection. Once that is done there will be four lanes from Toledo to Ogden. They still have quite a bit of shoulder work to do so two lane traffic will be common for a while.
Basically once the Tama-Toledo bypass and the Colo-Hwy 330 stretch is open only around 30 miles between CR and Ames will be 2 lanes. Should be able to make that drive in around 1.5 hours.