Yeah with a 11 days left I doubt they'll have it all done unless they work a lot of overtime.Still only at 93% with a week to go. Not going to make it.
Yeah with a 11 days left I doubt they'll have it all done unless they work a lot of overtime.Still only at 93% with a week to go. Not going to make it.
Answers to questions:
They were showing an NFL replay.
It's pretty much done.
The work going on now is mostly placing appliances and hooking them up, landscaping, testing and cleaning up construction dust. There's still a few things being bolted down outside but it's pretty much done. I'm no Ben Bunge but I'd almost guess they're not updating the percentage complete again until opening day. Most everything is complete. Most of the crews have pulled out and moved on to their next project. It's all finishing touches at this point.
The view from inside the club is amazing.
Media was going to tour this week so watch for more previews.
Huh?
Oh wow, completely my mistake! Sorry guys! Thought the poster was misspelling Ben Bruns. Carry on!There is a Ben Bruns and a Ben Bunge on the job!
Still only at 93% with a week to go. Not going to make it.
Bad news. In order to get the crane out, they needed to do some de-construction. Taken at 4:00 pm today:![]()
Bad news. In order to get the crane out, they needed to do some de-construction. Taken at 4:00 pm today:![]()
Will it still be finished by the UNI game?Bad news. In order to get the crane out, they needed to do some de-construction. Taken at 4:00 pm today:![]()
Bad news. In order to get the crane out, they needed to do some de-construction. Taken at 4:00 pm today:![]()
Bad news. In order to get the crane out, they needed to do some de-construction. Taken at 4:00 pm today:![]()
Bad news. In order to get the crane out, they needed to do some de-construction. Taken at 4:00 pm today:![]()
Is this just the start of the huge Sukup logo they're embedding under the stadium?
Bad news. In order to get the crane out, they needed to do some de-construction. Taken at 4:00 pm today:![]()