My timber tech deck was 10k for material and 6k for labor it is 22x14We had 3 quotes done.
1st-composite 28K wtf
2nd- treated wood w/ metal railing 10K
3rd-12x20 treated wood deck with wood railing 7K
My timber tech deck was 10k for material and 6k for labor it is 22x14We had 3 quotes done.
1st-composite 28K wtf
2nd- treated wood w/ metal railing 10K
3rd-12x20 treated wood deck with wood railing 7K
I quickly glanced at this and read it as modified, which I guess is possible in some ways.My timber tech d*ck was 10k for material and 6k for labor it is 22x14
I’m doing a 40x56 with 16’ walls pole barn in southern Iowa as well. $145k for all the bells and whistles. 1/3 of the barn will be a finished cabin.In the process of pricing both houses and pole barns. Located in south central Iowa. Figures coming in from $220-$250 per main level sq ft. $120-150 for 2nd story, and $35-60 for finished basement sq footage.
Pole barns are min $30/sq. Concrete is $5-5.50/ft and spray foam averaging around $3.25/ft.
Okay, before I read the finished cabin part, I was wondering how the heck you got that expensive at first. I have used Cleary a couple times now. Quality and construction were on par with Morton.I’m doing a 40x56 pole barn in southern Iowa as well. $145k for all the bells and whistles. 1/3 of the barn will be a finished cabin.
How long ago did you build this? Just wondering how much supplies have gone up since then. We will need to build a deck in a few months (or wait until next year).My timber tech deck was 10k for material and 6k for labor it is 22x14
If not after 4 hours seek medical attention.Is it ever going to come back down?
I used to work with lady in her mid sixties who always said “don’t call a doctor, call me!”If not after 4 hours seek medical attention.
Might be worth having a contractor to put in the posts and joists of the deck and install the composite floor boards yourself.
NuMark out of Pella is great for the pole barn. The only problem is that they are over 2 years out on bookings!Okay, before I read the finished cabin part, I was wondering how the heck you got that expensive at first. I have used Cleary a couple times now. Quality and construction were on par with Morton.
Two weeks agoHow long ago did you build this? Just wondering how much supplies have gone up since then. We will need to build a deck in a few months (or wait until next year).
May need to see if contractors are busy or not. If they slow down then you could really see some savings.I see that lumber futures are way down. Almost pre-pandemic levels. Is now a good time to start construction projects, or are the rising interest rates going to offset?
May need to see if contractors are busy or not. If they slow down then you could really see some savings.
May need to see if contractors are busy or not. If they slow down then you could really see some savings.
Damn near half what some were quoting in this thread only 5 months ago. Damn.Quoted $175 per sq ft for new construction in rural Iowa & at Lake of the Ozarks past couple of weeks by different contractors.