I’ve been wondering if that wall will continue to the corner of the corral when they’re done. Or maybe that’s a spot for a maintenance gate.
I’ve been pondering this myself and I think this might be how they finish it.
Wall 2 in the photo below will act like the retaining walls that are by the Jake. They will fill in soil along the east side of it for the ramp. The top of the
wall 2 will act as a concrete guardrail.
Then they will fill in on the west side of
wall 2 (south of the tunnel entrance) to match the east. Simultaneously, they will be backfilling the south side of
wall 1 (to the top of it).
They will then put some type of fencing on top of
wall 1 as shown
below (similar to before). It will probably need to be higher to match the perimeter fence, since the area to the north (left) of
wall 1 will now be an open area.
This depends on whether or not they keep the area south (right) of
wall 1 open to the public like before (those inside the stadium).
Edit: Rewatching this flyover video:
and noting how the top the retaining wall's shadow lays here:
I now think
wall 2 will be backfilled to the top on the right side and will be filled on the left to taper down to the top of
wall 1.
Wall 2 will have some type of guardrail/fencing similar to
wall 1.