I was just looking through the photo archive and noticed on 8/13/14 there is a make-shift tent structure overlooking a test-pile. Typically, after the test pile loading is complete and the data is analyzed the piers can get shorter in depth. The result of this is a credit back to the General Contractor and the Owner (Iowa State in this case) and also will speed along the installation as the drill depth is shorter and more piers can be completed in a day's work.
Anybody know if the piers got shorter as a result of the test pile?