Locker room and Players Lounge/Game Room are sweet.Lazard’s Instagram story has a nice walk through of the SPC
Locker room and Players Lounge/Game Room are sweet.Lazard’s Instagram story has a nice walk through of the SPC
Looks like there are some dead panels, too bad we didn't upgrade before we knew those a holes were going to leave the conference
Do those two Logo banners cover the speakers? Can you put video panels over the speakers? Not sure on that.We need to extend the actual video part of the board to cover that entire board.... take the ISU logo and conference logo off. The actual video part is too small for today's standards now.
Speakers don’t have to stay where they are.Do those two Logo banners cover the speakers? Can you put video panels over the speakers? Not sure on that.
True, but I'm sure that's easier and costlier said than done.Speakers don’t have to stay where they are.
Why? Above or below the board, on or outside the supports, I don’t really see much difference. It’s not like a new board itself will be cheap.True, but I'm sure that's easier and costlier said than done.
Nobody will ever see it, except for us that look at the webcam.I'm not sure if this has been mentioned...anyone else think it would be a nice touch to mow the Trice Stripes into the new hillsides? Could be another easy way to promote the "brand" and message.
Or perhaps mow them into the middle of the field, similar to what you see on some baseball fields.I'm not sure if this has been mentioned...anyone else think it would be a nice touch to mow the Trice Stripes into the new hillsides? Could be another easy way to promote the "brand" and message.
Perhaps they could mow these in while creating some sweet B-footage that any broadcast could use if they wanted to. That would make the most sense.I'm thinking mostly for pre-game shots of the stadium and/or various photos taken during the course of the year? Just sayin'
I hope they remember to water the new sodJust went back and looked. They were still working on the sod at 6:30 PM. I didn’t watch to see how much longer they stayed.
I hope they remember to water the new sod
The original renderings have the retaining walls painted red at least back to the video board on both sides.Does anyone "in the know" have any info on if they are going to paint those newly poured cement retaining walls, red? I'm talking about the walls that face the west and east side of the Jacobson building and partly face the field on the north endzone. I have seen some renderings showing it, but no action on that thus far.
I think they are expected to have everything done by September 1.Is there an official date when the current phase of JTS is completed? I know it will be ready before the UNI game but was wondering if anyone knew.